Q. Are permits required for the installation of emergency generators?

A. Generally yes and EN-R-G Generators will handle the permit process.

Q. Is there a difference between single phase and 3 phase electrical power?

A. Yes.  Single phase is used in homes and 3 phase is used in some light commercial and light industrial applications. 

3 phase is used on all others.

Q. When using an automatic generator system, how much time elapses between an outage and the generator coming on line?

A. Between 5 and 30 seconds.

Q. What costs can I look forward to in installing a residential system?

A. Depending upon site logistics, fuel availability and electrical load, the average generator powered by propane or natural gas would run a  total turn-key installation of between $12,000.00 and $20,000,00.